PROJECT

projelendirme
Fire Detection and Warning Systems
Extinguishing systems are not always sufficient alone. In some cases, the buildings are not equipped with an extinguishing system, but detection and warning systems are installed. It is specified in the regulation that these systems should be installed in which type of buildings, in which square meters and at what height. In general, we also use NFPA norms in projects that we design according to EN 54 standard, if requested.
Fire and Smoke Compartmentation Project
In order to confine fire and smoke in a region, it is necessary to determine the fire (Fire Zone) zones in the regulation well. After determining the fire (Fire Zone) zones, it is necessary to determine the fire resistance times of these zones.
Escape Route and Emergency Exit Routing Project
Escape routes and ladders need to be properly designed to evacuate people and direct them to emergency exits. The human load per square meter of each building is different. Therefore; The same conditions do not apply to industrial and commercial buildings.
Smoke Ejection Project
Evacuation of the smoke that will occur during the fire should be done naturally in some cases and by mechanical force in some cases. Although the minimum requirement about where it will be applied is written in the regulation, it sometimes does not meet the risk situations and requirements of the enterprises. In such cases, design should be made using international codes.
Stair Pressurization Project

A stair pressurization system should be installed in order to prevent smoke from entering the escape stairwells and to allow people to evacuate comfortably in a certain period of time. For this purpose, although the calculation criteria passed to the European standard are used, our company does not consider this sufficient. For this reason, it makes projects according to both European and American norms.

Automatic and Manual Extinguishing Systems Project
In buildings; It is determined whether the extinguishing system will be made according to the building usage class, size and height. Extinguishing system type is determined according to the building hazard class, fire load and content.
Fire Pump Room Project

Since it is almost impossible to provide the required flow and pressure for the extinguishing systems with the city water network in our country’s conditions, at least one fire pump should be used. In Turkish fire regulations, at least one spare is required in addition to a main pump.

Emergency Announcement Systems Project

The places where the emergency announcement system should be installed should be determined, sound intensity analyzes should be made according to the building type, and the placement of the announcement devices should be determined accordingly.

Seismic Suspension Systems Project
In the Turkish fire regulations, it is stated in which cases the seismic suspension systems that should be applied in the extinguishing systems should be made. Our company, which makes projects on how to do it based on NFPA 13 and FM Datasheet 2-8 code, also takes a printout with the Erico-Caddy Suspension Systems Calculation tool.